Evening Update on Pocatello Idaho

I had plans to get up to just the base of the spire today, but stuff came up, and I didn’t get what I wanted done. Still, not bad for a day’s work. The upper 2 stories follow similar design ques to the base story. Larger trim work, and there are these large metal panels between the upper and lower stories. There is some kind of detail work there, but as of yet I have not been able to identify exactly what it might be. For now I have left them plain as I work my way up.

Is till need to adjust the textures on these 2 stories, but this is mostly done in regards to the actual mesh work. There is a wheat detail visible on the upper portion of the pillars between the windows. I still want to make that and get it on there too.

Pocatello Idaho